Space and aerospace · Southern California

Your critical path shouldn't run through a vendor's voicemail.

Valence chases your suppliers, keeps parts and serials straight across every building and vendor, and moves sensitive and oversize hardware on the date it's needed. You see where every part is, and you make the calls.

A jet engine opened up for maintenance in a hangar
Our team has moved freight forBoeing · Rivian · Tesla

Sound familiar

  1. 01

    Hot parts. Half the build is waiting on three parts, and nobody can say when they ship.

  2. 02

    Vendor slips. The machine shop says next week, three weeks running, and the slip hits integration.

  3. 03

    The system says we have it. MRP shows it received, the floor can't find it, and the serial on the traveler doesn't match.

  4. 04

    Engineers doing logistics. Your best people spend Friday afternoon chasing shipping emails.

When a slip costs a test window, the freight bill is the smallest number in the room. We plan backward from the date that matters.

What we take on

Vendor management and expediting

Real ship dates, confirmed before pickup, and a heads-up the day one moves, with what it does to the build.

Parts and serial reconciliation

Ordered, shipped and received matched by part number, lot and serial, so a missing part shows up before integration, not during it.

Hardware moves

Air-ride, team drivers, oversize permits and escorts, and timed deliveries. Built around test stand and launch site dates, with live tracking on every move.

You see everything. You know what it costs. You decide. We recommend, you approve, we execute.

Tell us what's eating your week.

Fifteen minutes, no deck. We'll say what we'd take first.

[email protected](628) 212-9947

Tell us what's eating your week

1 of 5

Where is your brand today?

Pick the closest. It tells us which team you'd be talking to.